Skip to content
ACP-5 filings and stop work orders handled Open 24/7 (631) 743-4786
Smithtown Asbestos Removal logo

Licensed hands on every step

Asbestos Removal in Smithtown, NY With Licensed Crews Start to Finish

Pipe wrap in an older Smithtown basement or tile in the way of a new kitchen, a licensed crew tests it, seals the room under negative air, takes it out and clears the space so your project moves again.

Empty room with temporary supports during renovation

Who shows up at your door

  • Licensed by state and city

    Your job runs under an abatement license that New York State and New York City both issued to us, from first sample to final bag.

  • Credentialed, OSHA-trained crews

    Every worker on the crew is a state and city licensed asbestos handler with OSHA safety training.

  • Sealed work zones

    Poly sheeting, taped seams and HEPA machines pulling air inward hold the dust in the room being worked.

  • Air cleared before you return

    An independent clearance test comes before anyone steps back into the space.

  • Line open around the clock

    Disturbed material late at night or on a weekend? The emergency line picks up any hour.

Asbestos Work We Take On, Start to Clearance

Some calls start with a strange-looking ceiling. Some start with a ripped pipe jacket and a nervous contractor. Others start with a city permit stuck in review. Five services handle all of it, and the same licensed people run each one.

Six Steps, One Crew, No Loose Ends

  1. You call and describe it

    Describe the building, what you found and what is happening right now. A permit date, a stop work order or a ceiling that just came down all change the plan, so say it up front. You hang up knowing the next move.

  2. Sampling and lab results

    A certified inspector collects small pieces of anything questionable. An accredited laboratory reports which ones carry asbestos. No guessing, and no paying to haul out material that turns out to be harmless.

  3. Paperwork and written scope

    Any notifications the job needs, or the ACP-5 for a New York City project, get prepared. The removal scope and price are put in writing, so you know what comes out, how it is sealed off and what clearance looks like.

  4. Containment goes up

    Poly on the floors and walls. Registers, door frames and gaps taped shut. HEPA-filtered negative air machines switched on so the zone draws air in and never pushes it out into the rest of the building.

  5. Licensed removal

    Licensed handlers mist the material so it stays damp the whole time it is coming loose, then bag or wrap it, seal it and label it inside the zone. From there it rides to a facility permitted to accept it.

  6. Cleanup and clearance

    HEPA vacuuming, wet wiping, then independent air testing. The space goes back to you, your family or your contractor only after the clearance comes back clean.

Microscope objectives above a sample slide

Why Owners and Contractors Hand Us the Hard Ones

Asbestos jobs go sideways in two places: paperwork nobody checked and a work zone nobody sealed properly. Everything about how we work is built to close both gaps.

  • Built for jobs that get inspected hard

    Our crews are used to projects where every step is watched, logged and checked by an inspector. That same discipline comes to a basement in a single-family house. Procedures do not loosen just because the job is small.

  • The scope in writing before work starts

    What is being removed. How the area gets sealed off. Where the waste goes. What the clearance test has to show. All of it on paper before the first sheet of plastic goes up, so nobody argues about it later.

  • Licensed for the work, paperwork right from the start

    New York requires a licensed abatement contractor, and that is exactly who you get. Notifications, filings and disposal records are done correctly from the first day, so an inspection never turns up a gap that stalls your job.

Covering Smithtown and the Towns Around It

Smithtown sits in the middle of Suffolk County's North Shore, with Jericho Turnpike running through the business district and the Port Jefferson line of the Long Island Rail Road stopping in town, in St. James and in Kings Park. Much of the housing stock dates from the decades when builders still reached for asbestos products, so pipe wrap, old tile and textured ceilings tend to surface during remodels. We work across Smithtown and the neighboring hamlets, from Nesconset and Hauppauge down the Long Island Expressway corridor to Commack, East Northport, Brentwood, Central Islip, Islip and Bohemia.

Older homes, renovation season

Ranch houses, split-levels and colonials get new kitchens, finished basements and new boilers all the time. That is usually the moment suspect material shows up, and it gets tested before the work goes further.

Office parks and storefronts

Tenant fit-outs in Hauppauge and shops along Jericho Turnpike run into old floor tile and pipe insulation too. Work gets planned around the business so the rest of the building stays open.

One line for every hamlet

Kings Park, Bohemia or Central Islip, (631) 743-4786 reaches the same licensed crew, nights and weekends included.

Towns we cover

  • SmithtownJericho TurnpikeHome base
  • HauppaugeLong Island Expressway
  • NesconsetNesconset Highway
  • St. JamesLong Island Rail Road
  • Kings ParkSunken Meadow Parkway
  • Central IslipLong Island Rail Road
  • BrentwoodLong Island Rail Road
  • CommackJericho Turnpike
  • BohemiaVeterans Memorial Highway
  • IslipMontauk Highway
  • East NorthportLong Island Rail Road

Somewhere else in Suffolk County, or a property in New York City? Ask. There is a fair chance it is on our map.

Ask whether we cover your town: (631) 743-4786

Not Sure It Is Asbestos? That Is What the Call Is For

Nobody can tell asbestos by looking at it. Sampling and a lab can. Talk through what you found, where it is and what you were planning to do, and you will know the safe next step before you hang up.

Settle the asbestos question by phone: (631) 743-4786

Plain answers, nothing to sign on the call.

What Smithtown Callers Ask Before the Work Starts

Straight answers to the questions we hear on almost every call.

Should a renovation or teardown wait for an asbestos test?

Yes, when the work will cut, sand or tear out materials from an older building. Testing first shows exactly which materials need licensed removal and which your regular contractor can handle. On New York City jobs, an asbestos survey is also part of getting Department of Buildings permits.

What sets the price of an asbestos removal job?

The material, how much of it there is, where it sits and how tricky the space is to contain. A short run of pipe insulation in an open basement is a very different job from tile buried under layers of newer flooring. Filings, disposal and the clearance test are part of the total too, and you see the full scope and price in writing once the material has been seen and tested.

How do you keep asbestos dust from traveling through the house?

Containment comes before anyone lays a hand on the material. Plastic covers floors and walls, openings and vents are taped shut, and HEPA-filtered machines draw air into the zone rather than letting it drift out. The material stays damp while it comes off, goes straight into bags, and the area is HEPA vacuumed and wiped down before clearance testing.

How long will the removal itself take?

It depends on the job, so we do not put a time on it before seeing it. Setup, removal, cleanup and air clearance each take their own stretch, and larger projects can need advance notice to the state before work begins. Once the scope is set, you get a realistic schedule in writing.

Is asbestos going to throw off my renovation schedule?

Not if it is found early. Tested before demolition starts, removal becomes one planned step on the calendar. Delays come when someone opens a wall, finds suspect material and the whole job stops, which is exactly what testing up front prevents.

Which licenses should an asbestos company hold in New York?

The contractor needs a New York asbestos license, and each person on the crew needs an asbestos handler certificate. Work inside the five boroughs also calls for New York City DEP certificates. Before anyone starts, ask to see them, along with how air monitoring and disposal will be handled.

Can my family stay home while the work is going on?

Often, yes, in the parts of the house away from the sealed zone, since it is kept under negative air. Nobody goes into the containment, and kids and pets stay well clear of it. If the work sits next to bedrooms or the only kitchen, staying elsewhere until clearance can be simpler, and we talk through your layout before setup.

Steady Hands When Asbestos Turns Up

Smithtown Asbestos Removal exists for the moment a job hits asbestos and everything stops. Maybe it is a ceiling. Maybe it is a city order taped to the door. We test, file, seal off, remove and clear, with licensed people on every piece of it, and we explain each step in plain words while it happens.

See how we run a job
Worker in a protective suit and boot covers behind barrier tape
Apartment building with balconies

Get the Asbestos Off Your To-Do List

Tell us what you found, where it is and what you need to happen next. Renovation, sale, emergency or a stalled city permit, we lay out the steps on the same call.

Answering for Smithtown and nearby Suffolk County towns, any hour.