Skip to content
ACP-5 filings and stop work orders handled Open 24/7 (631) 743-4786
Smithtown Asbestos Removal logo

City permit paperwork

ACP-5 Filing for Smithtown Owners and Contractors With City Jobs

Your project sits inside the city. We line up the investigator, the survey and the report so the permit can move.

Clipboard and pencil on a wooden desk

Why a Suffolk Owner Needs a City Form

Lots of people who live or work around Smithtown also own property or run jobs inside the five boroughs. An apartment house in Queens. A shop renovation in Brooklyn. A gut job in the Bronx that a contractor is managing. Within the city limits, the Department of Environmental Protection operates its own asbestos program, and one of its central documents is the ACP-5, known as the Asbestos Assessment Report. Worth saying plainly: this is a city requirement only. Jobs here in Suffolk County fall under New York State rules, and no ACP-5 applies to them. For a project in the boroughs, though, most Department of Buildings permit applications need an ACP-5 when the planned work leaves regulated asbestos undisturbed. A DEP-certified asbestos investigator signs it after surveying the area the work will reach. If that survey finds asbestos the project would disturb, abatement under a project notification comes first, and the job continues after. We arrange the survey, coordinate the investigator, take care of the filing and, if asbestos shows up, plan the abatement as well. You always know where the permit stands and what is next, without chasing forms yourself.

What ACP-5 Help Includes

The pieces that usually stand between a city project and its permit.

  • A look at the scope of work

    What the permit covers and which parts of the building the work will touch.

  • Survey by a DEP-certified investigator

    The investigator inspects the area the work will reach and samples questionable materials as the city expects.

  • Lab analysis

    Samples are analyzed by an accredited laboratory before conclusions are drawn.

  • The ACP-5 prepared and filed

    If the planned work leaves regulated asbestos alone, the investigator completes and signs the assessment report.

  • A plan if asbestos is found

    Material the work would disturb gets an abatement plan and the project notification it needs.

  • Licensed abatement

    Containment, wet removal, sealed disposal and air monitoring before the main work starts.

  • Coordination with your expediter

    We work alongside your architect, expediter or general contractor on the filings.

  • Status in plain words

    You know what has been filed, what is pending and what the next step is.

From Survey to Filed Report

  1. Lay out the project

    Give us the building, the borough and the work planned. We work out what the survey needs to cover and who on your team we should coordinate with.

  2. Survey and sample

    A DEP-certified investigator inspects the work area and samples suspect materials, and the samples go to an accredited lab.

  3. File or abate

    With nothing regulated in the way, the ACP-5 is prepared and filed. If asbestos sits in the work area, it is abated under a project notification first.

Reasons Contractors Hand Us the Paperwork

  • One team for survey and abatement

    If the survey finds asbestos, the abatement is already in the same hands. No starting over with a new company.

  • Paperwork that holds up

    Filings are prepared carefully so a reviewer has no reason to send them back.

  • Clear about what applies

    You get an honest read on which city rules touch your project and which do not.

  • DEP-certified investigator
  • Accredited lab analysis
  • Filings handled
  • Abatement if needed

Is a Permit Waiting on an Asbestos Form?

Give us the address and the scope of work. You will hear what the city expects and how to get the survey and filing going.